The Barnum to Open Spring 2021 in White Bear Lake

Posted Under: Uncategorized

The Barnum, located in White Bear Lake between the Stadium Sports Bar and Linden Avenue on County Road East, will include a four-story apartment complex consisting of 192 market rate units. The roughly 4.67-acre site previously accommodated three single family homes and a handful of vehicle and storage structures. At 41 units per acre, zoning will change from general business and medium-density residential to high-density residential.

The current mix of units includes studios (36), 1-bedroom (98) and 2-bedroom (58) units.  The development will feature indoor and outdoor amenity spaces, primarily located on the first level.  Building wide amenities will include a fitness center, outdoor patio, pool, package notification and storage system, yoga studio, community room, interior bike parking, an on-site management office, and green space. In unit amenities will include solid surface counter tops, stainless steel appliances, balconies or patios in select units and a washer/dryer in every unit.

Construction is projected to take approximately 16 months with the completion date expected to be in Spring 2021.